Category: My New Room

Building my studio

Trick or Treat

It’s Halloween at the construction site. Here are M and Dan: Ever good-natured Robert agrees to model my new foam-rubber Elvis wig. (There was a photo of me doing same, but my eyes were closed and my mouth was open, so the picture is history.) But here: I’ll put up a Halloween picture of me disguised as a middle-aged, self-employed ex-hippie holding a foam-rubber Elvis wig. Boo!

Read more

It’s Pouring

The concrete truck arrives on a Monday morning. Vidal gives the sign that he’s ready for the pour to begin. Once the stuff starts flowing, the hose springs to life like a great-granddaddy anaconda. Vidal levels the first swath. Robert takes the next turn at pouring… …and signals when it’s time to pause the flow. I don’t know if this is ideal way to spend one’s first day back from Hawaii, but Dan’s in good […]

Read more

Shivering Timbers

After a bunch of digging, the site was ready for the house-lifters who arrived with a flatbed truck loaded with 6- by 6-inch and bigger wooden beams. The men hauled scores of these honkers into the backyard… …tossing them around with such ease you’d think they (the logs; not the men) were hollow. Then the house-raising guys started stacking the beams like Lincoln Logs… …higher… …and higher… …until they bumped into the top. Resting on […]

Read more

The Very Foundation

The next step is to finish the excavation and build forms for the foundation. Unfortunately for those who had to wield the heavy-duty jackhammer, the scheduled half-day of breaking concrete became a day and a half. That was some stubborn cement: The guys wove an elaborate web of rebar, in some places artistic and elegant: In other places, form followed function: It seems a pity that all this artistry will soon be buried.

Read more